OUR PROJECT

110-Meter Truss Bridge for Track Doubling Project

Client

A.S. Associated Engineering (1964) Co., Ltd.

Location

Thailand

Deliverables

Track Doubling Truss Bridge (110 meters)

Year

2025

Description

Steelmer is proud to announce that we have been awarded the project development and fabrication for a Track Doubling Truss Bridge (110 meters) — the railway bridge over Khlong Phan Nam – Khlong Chumphon, located near Saengdaeng Railway Station.

SCOPE OF WORK

  • Fabrication of structural steel components for the 110-meter truss bridge

  • Pre-assembly and camber control to ensure precision, alignment, and long-term structural integrity

  • Hot-dip galvanizing for corrosion resistance and extended service life

  • Delivery to site, including complete quality inspection and logistics coordination

The total fabricated steel weight is 606,133.08 kilograms, showcasing Steelmer’s engineering strength and ability to handle large-scale, heavy steel structures with precision and quality.