OUR PROJECT
110-Meter Truss Bridge for Track Doubling Project






Client
A.S. Associated Engineering (1964) Co., Ltd.
Location
Thailand
Deliverables
Track Doubling Truss Bridge (110 meters)
Year
2025
Description
Steelmer is proud to announce that we have been awarded the project development and fabrication for a Track Doubling Truss Bridge (110 meters) — the railway bridge over Khlong Phan Nam – Khlong Chumphon, located near Saengdaeng Railway Station.
SCOPE OF WORK
-
Fabrication of structural steel components for the 110-meter truss bridge
-
Pre-assembly and camber control to ensure precision, alignment, and long-term structural integrity
-
Hot-dip galvanizing for corrosion resistance and extended service life
-
Delivery to site, including complete quality inspection and logistics coordination
The total fabricated steel weight is 606,133.08 kilograms, showcasing Steelmer’s engineering strength and ability to handle large-scale, heavy steel structures with precision and quality.