OUR PROJECT

Granulator Scrubber

Client

Slot Nankai Co.,Ltd.

Location

Laem Chabang Port for shipping abroad

Deliverables

Granuator Scrubber, Duct, Beam and Steel Frame

Year

2024

Description

Steelmer provides the following fabrication work for the Granulator Scrubber:
Fabrication work
1) Granuator Scrubber 2 Unit
– Middle part 
– Inlet Duct 
– Outlet Duct 

2) Granuator upper casing  2 Unit
– Upper casing

3) Transport beam and Steel Frame
– Transport beam, Steel frame
Total weight for fabrication work = 412,711 kg.

Assembly work at Laem chabang yard.
1) Granulator Scrubber 
2) Granulator Upper casing 
3) Granulator Lower casing(Completed set) 
4) Transport beam and Steel frame
Total of Assembly work. = 522,710 kg.