OUR PROJECT

Metro particle board line #3 Prachinburi

Client

Metro particle Co.,Ltd

Location

Prachinburi

Deliverables

Drying unit and Silo 

Year

2013

Description

Steelmer was awarded 1,540 tonnes of Dry area for particle board line 3 Metro group including structural and mechanical assembly for the Pal, Dieffenbacher, Imal, Deusch.

Drying unit

  • Drum dryer dia 6.6 x 30 m 365 ton
  • 16 nos. of Battery cyclone
  • 8 nos. of Hot gas cyclone
  • Mixing chamber
  • Discharge box

Silo

  • Over size silo
  • Fire lock silo
  • SL silo
  • CL silo

Machine part 450 tonnes install for Screening and Air grader area