OUR PROJECT
Metro particle board line #3 Prachinburi



Client
Metro particle Co.,Ltd
Location
Prachinburi
Deliverables
Drying unit and Silo
Year
2013
Description
Steelmer was awarded 1,540 tonnes of Dry area for particle board line 3 Metro group including structural and mechanical assembly for the Pal, Dieffenbacher, Imal, Deusch.
Drying unit
- Drum dryer dia 6.6 x 30 m 365 ton
- 16 nos. of Battery cyclone
- 8 nos. of Hot gas cyclone
- Mixing chamber
- Discharge box
Silo
- Over size silo
- Fire lock silo
- SL silo
- CL silo
Machine part 450 tonnes install for Screening and Air grader area
