AFT waste heat recovery Project

Steelmer has been entrusted by Greentech to provide the steel structure for the Waste Heat Recovery system, with a total weight of 15 tons. This includes all the necessary steel framework to support and assemble the components of the system.
Key Components of the Waste Heat Recovery System:
Flue Gas Duct Inlet: 5,587.88 kg
Flue Gas Bypass Duct: 2,793.94 kg
Flue Gas Duct Outlet: 4,190.90 kg
Flue Gas Duct ID Fan: 1,396.97 kg
Hopper Fabrication and Inlet Plenums Fabrication: 9,035 kg

Tosyali Algeria DRI Plant

Steelmer was responsible for executing the DRI Plant project, which included the following components:

Oxide Coating Storage Bin 14,400 kg
Dust Collection Scrubbers 51,600 kg
Dust Collection Stacks 68,200 kg
Hot Flue Gas Stack 134,500 kg
Furnace Charge Hopper 38,704 kg

These components were supplied by Steelmer in accordance with the project requirements, demonstrating their expertise and commitment to quality in the delivery of the project.

Why Mining Tipper Trucks Are Different: Key Features and Benefits​

Mining tipper trucks are specially engineered for some of the most challenging environments, offering unparalleled efficiency and durability in extreme conditions. These heavy-duty trucks are a critical component in the mining industry, ensuring that operations run smoothly and productively. So, what makes mining tipper trucks stand out from the rest? Let’s dive deeper into their unique features and advantages.

Enhancing the strength of Pusher Feeding with Hardox HiAce

Pusher feeder is responsible for moving materials (in this case, often wood waste or other debris) into a combustion furnace. The parts in constant contact with the material must endure significant forces, including:
1.Friction
2.Abrasion
3.High temperatures
4.Moisture exposure
These components work continuously under harsh and challenging conditions, demanding that the materials used in their fabrication be strong, durable, and resistant to a variety of stress factors.