Metro particle board line #3 Prachinburi
Steelmer was awarded 1,540 tonnes of Dry area for particle board line 3 Metro group including structural and mechanical assembly for the Pal, Dieffenbacher, Imal, Deusch.
Steelmer was awarded 1,540 tonnes of Dry area for particle board line 3 Metro group including structural and mechanical assembly for the Pal, Dieffenbacher, Imal, Deusch.
Steelmer has been entrusted with the critical task of managing the steel structure for Aditya Birla Chemicals (Thailand) Ltd., which weighs a total of 692,635 kg.
Steelmer was contracted with Slot-Nankai company limited to provide structural steel and cartridge with casing a New Takehara Thermal Power Plant project, Hiroshima Japan.Pre-assembly bottom structure and fit out of casing, handrails, ladders and grating frames.
Bottom structure 770 ton
Casing structure 1,126 ton
Inlet & Out let duct 178 ton
Transport beam 150 ton
Cartridge 220 ton
Steelmer is responsible for fabricating and assembling components for the Granulator Scrubber, including the middle part, ducts, upper and lower casings, and transport beams, with a total fabrication weight of 412,711 kg and assembly weight of 522,710 kg. The work takes place at Laem Chabang yard.
OUR PROJECT S.Kijchai MDF plant #1 Rayong Client S.Kijchai MDF Location Rayong Deliverables Steel Structure, Cyclone, Duct Year 2018 Description The scope of work included the supply of detail drawings, fabrication of steel work, surface treatment and packing delivery to Klang, Rayong. for steel structure & plate work and machine installation. The project was successfully completed. Cyclone Dryer cyclone Air grader cyclone Reject cyclone Scalper cyclone Waste handling cyclone Start up cyclone Vender issue equipment installation 350 ton Forming area Structure 260 ton Drying discharge chute 12 ton Mixing chamber 103 ton Discharge box