AFT waste heat recovery Project

Steelmer has been entrusted by Greentech to provide the steel structure for the Waste Heat Recovery system, with a total weight of 15 tons. This includes all the necessary steel framework to support and assemble the components of the system.
Key Components of the Waste Heat Recovery System:
Flue Gas Duct Inlet: 5,587.88 kg
Flue Gas Bypass Duct: 2,793.94 kg
Flue Gas Duct Outlet: 4,190.90 kg
Flue Gas Duct ID Fan: 1,396.97 kg
Hopper Fabrication and Inlet Plenums Fabrication: 9,035 kg

Tosyali Algeria DRI Plant

Steelmer was responsible for executing the DRI Plant project, which included the following components:

Oxide Coating Storage Bin 14,400 kg
Dust Collection Scrubbers 51,600 kg
Dust Collection Stacks 68,200 kg
Hot Flue Gas Stack 134,500 kg
Furnace Charge Hopper 38,704 kg

These components were supplied by Steelmer in accordance with the project requirements, demonstrating their expertise and commitment to quality in the delivery of the project.

Desulfurizer twin tower project for J-Power entech, Co., Inc.

Steelmer was contracted with Slot-Nankai company limited to provide structural steel and cartridge with casing a New Takehara Thermal Power Plant project, Hiroshima Japan.Pre-assembly bottom structure and fit out of casing, handrails, ladders and grating frames.

Bottom structure 770 ton
Casing structure 1,126 ton
Inlet & Out let duct 178 ton
Transport beam 150 ton
Cartridge 220 ton

S.Kijchai MDF plant #1 Rayong01

S.Kijchai MDF plant #1 Rayong

OUR PROJECT S.Kijchai MDF plant #1 Rayong Client S.Kijchai MDF  Location Rayong Deliverables Steel Structure, Cyclone, Duct Year 2018 Description The scope of work included the supply of detail drawings, fabrication of steel work, surface treatment and packing delivery to Klang, Rayong. for steel structure & plate work and machine installation. The project was successfully completed. Cyclone Dryer cyclone Air grader cyclone Reject cyclone Scalper cyclone Waste handling cyclone Start up cyclone Vender issue equipment installation 350 ton Forming area Structure 260 ton Drying discharge chute 12 ton Mixing chamber 103 ton Discharge box